Well equipment, supplied and supported.
Miroil UA supplies well completion equipment — upper and lower completion and thru-tubing tools — and provides engineering support for the operations, for oil and gas operators in Ukraine.

Completion equipment, group by group
Three product groups covering the well from the reservoir section to surface — supplied with engineering support.
Upper Completion
From the producing zone to the wellhead — packers, flow control devices, safety valves and associated equipment.
Lower Completion & Stimulation
Liner hangers, multistage frac systems, plugs and casing accessories across the producing zone.
Thru-Tubing & Intervention Tools
Fishing, milling, jetting, coiled-tubing tools, packer & plug systems and tubing patches.
Engineer-led
Engineers who design the job support it on location through to completion.
HPHT-capable
Built for deep, high-pressure, high-temperature wells typical of Ukraine's basins.
Ukraine-based
Local presence for faster delivery, support and spares.
Accountable
One team owns the programme end to end — supply, engineering and reporting.
Have a well to complete?
Send the well, the objective and the constraints — we reply with a feasibility read.
Equipment for oil and gas wells
Supplied from the group's manufacturing range, so everything listed is deliverable. Engineering support for the operations is available across all groups.
Upper Completion
From the producing zone to the wellhead — packers, flow control devices, safety valves and associated equipment.
Lower Completion & Stimulation
Liner hangers, multistage frac systems, plugs and casing accessories across the producing zone.
Thru-Tubing & Intervention Tools
Fishing, milling, jetting, coiled-tubing tools, packer & plug systems, tubing patches and gauges.
Upper Completion
Everything from the production packer to the wellhead — the tubing string, flow control, downhole safety and gas lift. Supplied with engineering support.
| Equipment | Size, min–max | Pressure, min–max | Temp., min–max | Type / notes |
|---|---|---|---|---|
| Production packers — permanent seal-bore | 3½″–13⅜″ | 5,000–10,000 psi* | 121–204 °C | Seal-bore; special elastomers to 343 °C |
| Retrievable packers — mechanical / hydraulic set | 2⅞″–13⅜″ | 5,000–10,000 psi | 121–204 °C | Standard 7,000–7,500 psi; HT version to 10,000 psi |
| Thermal & tension packers | 2⅞″–13⅜″ | 5,000–7,000 psi | 232–343 °C | Steam injection; tension-set |
| Tubing anchors & catchers | 3½″–9⅝″ | n/a | n/a | Mechanical & hydraulic |
| Seal assemblies & seal-bore extensions | 3½″–13⅜″ | 5,000–10,000 psi* | 121–204 °C | Nitrile → HNBR → Viton → ATR stacks |
| Landing nipples | 1.660″–5½″ | per tubing rating | n/a | Seal bore 1.250″–4.562″; selective & no-go |
| Sliding sleeves | 2⅜″–3½″ | 5,000 psi std; higher metal-seal | 200 °C std; higher metal-seal | ID 1.875″–2.813″ |
| Side-pocket & gas-lift mandrels | 2⅜″–4½″* | 5,000–10,000 psi* | 121–177 °C* | Gas lift / chemical injection |
| Tubing-retrievable safety valve (TRSCSSV) | 2⅜″–4½″* | 5,000–10,000 psi* | 121–177 °C* | Surface-controlled; HPHT & sour-service versions |
| Flow couplings & blast joints | 2⅜″–4½″* | per tubing rating | n/a | Erosion protection |
| Chemical injection valves | ¼″–⅜″ line* | 5,000–10,000 psi* | 121–177 °C* | Downhole dosing |
| Expansion joints & safety joints | 1.900″–9⅝″ | per tubing rating | 121–204 °C | Stroke up to 20 ft; pinned, splined, clutched, thermal |
| Lock mandrels & storm chokes | 1.660″–5½″ | 5,000–10,000 psi* | 121–177 °C* | Fits nipple bores 1.250″–4.562″ |
| Pump-out plugs & cementing sleeves | 2⅜″–5½″ | adjustable shear | n/a | Full ID after pump-out |
| Polished bore receptacle (PBR) | 4½″–7″* | 5,000–10,000 psi* | 121–204 °C | PBR length 1.5–20 ft |
Ranges from manufacturer catalogues. Values marked * are typical industry ranges. Temperature spans standard to high-temperature options. Exact specification is confirmed per well on job design.
- Packer running, setting & retrieval — hydraulic / mechanical
- Running completion string — tubing-conveyed installation
- Tubing hanger installation
- SSV installation & function / inflow test
- Completion string selection
- Tubing movement & stress analysis
- Well integrity & barrier philosophy
- Running procedures
Need an upper completion scoped?
Send the well and objective — we reply with equipment and a running plan.
Lower Completion & Stimulation
The reservoir section — liner hangers, multistage fracturing, zonal isolation and the casing accessories that get the string to depth. Supplied with engineering support.
| Equipment | Size, min–max | Pressure, min–max | Temp., min–max | Type / notes |
|---|---|---|---|---|
| Liner hanger systems | 4½″–13⅜″* | 5,000–10,000 psi* | 121–177 °C* | Cemented & non-cemented; PBR 1.5–20 ft |
| Liner running tools | 4½″–13⅜″* | per hanger rating | n/a | Hydraulic / mechanical |
| Multistage frac sleeves | 3½″–5½″* | 7,500–15,000 psi | 121–177 °C* | Ball-drop, sliding, toe — up to 30 stages |
| Plug-and-perf frac plugs | 4½″–7″* | 8,000–15,000 psi | 66–177 °C* | Composite & dissolvable |
| Bridge plugs | 4½″–20″ | 2,000–10,000 psi | 150–425 °C | CIBP & retrievable; std 150 °C, HT 200 °C, thermal 425 °C |
| Cement retainers | 4½″–13⅜″ | up to 10,000 psi (≤ 8⅝″) | 150–227 °C | Drillable; mechanical / wireline set |
| Casing accessories | 4½″–20″ | n/a | n/a | Float equipment, stage cementing collar, centralisers |
| Open-hole packers | 4½″–9⅝″* | 5,000–10,000 psi* | 121–177 °C* | Swell & mechanical; zonal isolation |
| Hydraulic toe-initiation sleeve | 4½″–5½″* | 7,500–10,000 psi* | 121–177 °C* | First-stage opening by pressure |
| Plug & packer setting tools | 4½″–16″ casing | 4,000–10,000 psi | n/a | Hydraulic (tool OD 1.72″–4.50″) & wireline adapters |
Ranges from manufacturer catalogues. Values marked * are typical industry ranges. Temperature spans standard to high-temperature options. Exact specification is confirmed per well on job design.
- Multistage fracturing — plug-and-perf, ball-drop
- Liner hanger running & setting
- Plug setting & zonal isolation
- Re-fracturing — ball-drop method
- Stimulation / completion design
- Stage-count & placement planning
- Running procedures
Planning a stimulation?
Share the well and the target — we scope equipment and the frac programme.
Thru-Tubing & Intervention Tools
Tools that go back into live wells — fishing, milling, jetting, coiled-tubing tools and packer & plug systems — plus tubing patches and downhole gauges.
| Equipment | Size / OD, min–max | Pressure, min–max | Conveyance | Type / notes |
|---|---|---|---|---|
| Packer & plug systems | 2⅜″–4½″ tbg* | 5,000–10,000 psi* | CT / wireline | Inflatable, solid-body, permanent & retrievable |
| Coiled-tubing tools | OD 1.69″–3.13″* | 5,000–10,000 psi* | CT | Connectors, motorhead, filters, stabilisers |
| Fishing tools | OD 0.88″–2.69″ | n/a | CT / slickline | Overshots, spears, pulling tools, jars, magnets |
| Jetting technology | OD 1.69″–3.13″* | n/a | CT | Rotary jetting, junk baskets, nozzles |
| Milling & under-reaming | OD 1.69″–3.13″* | n/a | CT | PDM motors, mills, tubing cutters |
| Tubing patches | 2⅜″–4½″ tbg* | 5,000–10,000 psi* | — | Expandable / tubing patch for repair |
| Memory gauges & carriers | — | n/a | Slickline | Pressure / temperature data |
| Plug & packer setting tools | OD 1.72″–4.50″ | 4,000–10,000 psi | CT / wireline | Electronic & hydraulic |
| Shifting & indexing tools | 2⅜″–4½″ tbg* | n/a | CT / slickline | Sleeve shifting |
| Wireline running & retrieval tools | OD 1.42″–3.48″ | n/a | Slickline | Nominal 1.50″–4.00″; toolstring stem OD 1.25″–3.50″ |
| Gauge cutters, swages & bailers | OD 1.125″–5.00″ | n/a | Slickline | Drift, cleanout & sampling |
| Wireline pressure control | — | 5,000–10,000 psi | Surface | Lubricators, stuffing boxes, wireline valves; NACE spec |
Ranges from manufacturer catalogues. Values marked * are typical industry ranges. Temperature spans standard to high-temperature options. Exact specification is confirmed per well on job design.
- Coiled-tubing operations — cleanout, milling, placement
- Well intervention — live-well, programmed
Thru-tubing tools are supplied for the operator's or contractor's crews, with our engineering support during the job. Complex remedial programmes are scoped case by case.
Well needs intervention?
Tell us the problem downhole — we select the tools and support the job.
Engineering support and design
We supply the equipment and provide engineering support for running it — the operations themselves are performed by the operator's or contractor's crews.
- Packer running, setting & retrieval (hydraulic / mechanical)
- Running completion string / tubing-conveyed installation
- Tubing hanger & SSV installation, function test
- Multistage fracturing (plug-and-perf, ball-drop)
- Liner hanger running & setting
- Plug setting & zonal isolation
- Coiled-tubing operations & well intervention
- Completion design & programme
- Completion string selection
- Torque & Drag analysis
- Tubing movement & stress analysis
- Well integrity & barrier philosophy
- Running procedures
- Vendor management
Advanced studies (nodal / thermal modelling, fatigue, HAZOP facilitation) available on request through partners.
From enquiry to handover
Enquiry & scope
Well data, objective and constraints — depth, pressure, temperature, timing.
Job design
Completion programme, equipment selection and ratings, running procedure.
Supply
Sourcing from the group range, QA, inspection and delivery.
Support on location
Our engineers support the operator's crew on location, with every step documented.
Reporting
As-run report, data and lessons handed back to the operator.
Need a job scoped?
We reply with a feasibility read and a path to a quote.
Completion equipment and engineering for Ukraine's wells
Miroil UA is an oilfield equipment and engineering company based in Ukraine. We supply completion equipment across the well — upper completion, lower completion and thru-tubing tools — and provide engineering support for running it, for oil and gas operators in Ukraine.
The company is led by engineers with 15+ years in HPHT completions, coiled tubing and well intervention. The engineers who design the job support it on location.
Every programme is engineered before it is quoted. We would rather turn down work that falls outside our envelope than put our name on a job we cannot stand behind.
What you get working with us
Engineer-led
The engineers who design the completion support it on location.
HPHT-capable
Experience in deep, high-pressure, high-temperature wells.
Group-backed supply
Equipment sourced from an established manufacturing range — everything we list is deliverable.
Accountable
One team owns the programme end to end: supply, engineering and reporting.
Safety and integrity, by procedure
Engineering support follows documented procedures, and equipment is inspected and certified for each job. Well integrity and barrier verification are part of job design, not an afterthought.
Work with us
Tell us what you're completing and we'll take it from there.
Scope a job with us
Send the well, the objective and the constraints — we reply with a feasibility read and a path to a quote.
Email us the well, the objective and the constraints: well type, depth, pressure, temperature and timing.
Write an emailYour message goes straight to our mailbox; this website does not collect or store it. See the Privacy policy.
Privacy policy
Last updated: 21 November 2026
Who we are
LLC "MIROIL UA", 4 Oresta Levytskoho St., Poltava 36008, Ukraine, is responsible for this website. Contact: [email protected].
What data we process
The website has no forms, user accounts, analytics or advertising cookies. If you email us, we receive your name, email address and the content of your message, and use them only to answer your enquiry and prepare a commercial offer.
Technical data
The website is hosted by Cloudflare, which processes visitors' IP addresses and request data to deliver and protect the site. Fonts and images are served from our own domain; no third-party trackers are loaded.
Browser storage
The website saves your language and colour-theme choice in your browser (localStorage). This data stays on your device.
Legal basis and retention
We process enquiry data to answer business requests and to take steps before entering into a contract (Law of Ukraine "On Personal Data Protection"; GDPR Art. 6(1)(b) and (f)). We keep enquiry correspondence for up to 36 months, unless a contract requires longer storage.
Your rights
You can ask us to access, correct or delete your data, or object to its processing, by writing to [email protected]. You may also complain to the Ukrainian Parliament Commissioner for Human Rights or, if you are in the EU, to your local data protection authority.